2000 - 2012
ES Denizcilik has successfully executed numerous projects involving the engineering, design, procurement, construction, and commissioning of oil and chemical storage tank facilities, tailored to varying capacity and volume requirements across different geographical locations.
The Petkim Container Port Back Area and Breakwater Construction and Electrical Works Project has commenced.
2013
2014
- Commencement of Star Refinery Terrace 3 Construction Works Project.
- Commencement of Star Refinery Marine (Liquid Cargo) Terminal Construction (SRS) Project.
- Burak Furkan Split Hopper joined the marine fleet.
- Emir Zeynep Backhoe Dredger joined the marine fleet.
- Beril Can Split Hopper joined the marine fleet.
- Completion of the Petkim Container Port Backyard and Breakwater, Electrical Works Project.
- Completion of the Project for Connected Pipeline Systems between Star Refinery and PETKIM.
- Construction of Turkiye's largest dredger, Kanuni D.S., was completed and launched.
2017
2018
- The Petkim Quay 2 Strengthening Project, including construction, installation, implementation, and fore-pier dredging works, has commenced.
- The construction works for the Star Refinery, Terrace 3 Area (SPE), have been completed.
- The construction and mechanical works projects for the Cofot crude oil and fuel oil tanks have commenced.
- The Petkim Aliağa Refinery Port Salt and Tanker Quays Strengthening Project, Quay-3, has commenced.
2019
2020
- Construction of the Fuel Station and Commercial Complex has commenced.
- The Petkim Quay-2 Strengthening Project, involving the supply of steel pipes, transportation to the site, and preparation for driving, has commenced.
- Construction of the Petkim New Salt Storage Area has been completed.
- The Fuel Station and Commercial Complex has been completed and put into operation.
2021
- Tezcan Atlas, Barkın B, and Cemal Beyza Split Hopper Barges joined the fleet.
- Demirbas 06 pile driving pontoon joined the fleet.
- Deren, Backhoe Dredger joined the fleet.
- Demirbas 34 floating crane joined the fleet.
- Seabed dredging and disposal works in the İskenderun region have been completed.
- The Petkim Quay 3 Strengthening Project, including construction, installation, implementation, and fore-pier dredging works, has commenced.
2023
2024
- Split hopper barges Mehmet Emin Öğüt, Ali Kerem Öğüt, and Zeynep Sahra joined the fleet.
- Mersin Region seabed dredging, excavation, and fill works completed.
- İzmir Region seabed dredging and disposal works completed.
- Demirbas 61 Pontoon Crane joined the fleet.